CASE STUDY
Leatherhead
Refurbishment
One stop shop refurbishment solution to a full kitchen, dining room, utility and office.
Location:
Leatherhead
Budget:
£40k + VAT
Duration:
12 weeks
Trades:
Groundworks, Bricklayer, Steel erector, Electrician, Plumber, Carpenter, Dry lining, Plastering, Flooring contractor and Decorator,
Scope of work:
The project started with a complete demolition and strip-out of existing rooms. We removed the wall between the kitchen and dining room to create an open-concept space and made a new structural opening in the external masonry for bi-folding doors and glazing. A new office area was built, and the heating system was upgraded with a modern wet underfloor heating system.
We installed new insulation, a screed floor topped with a sleek resin finish, and implemented a new lighting design with updated power requirements. The interior was enhanced with new skirtings, internal doors, and a complete decoration. The result is a transformed, modern living space that combines functionality and style.
If you are thinking about a refurbishment, get in touch with EMH Services.